Rocklands Copper Project

 Las Minerale Central is the focus of intense drilling on a 25 X 25m grid to vertical depths greater than 250m.  The drilling is designed to define Measured resources for mine planning and a bankable feasibility study.

The West and East Zones commence at 10900E and 11700E respectively remain only partially tested along strike and at depth.

In addition to these known mineralised zones, there are a number of targets on the EPM identified through geophysical surveys. 

Ground magnetics on CuDECO’s Rocklands Copper Project EPM and the location of the drill collars within the local grid, are illustrated in the above image.

  
Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10